I'm not really thrilled with the new Cheetah, considering that it has an XL engine & Ferro-Alum armor, they could have done a lot better IMO. The mission is simple - Outgun, Outrun & Outlast the FedCom fighters (Sparrowhawk)
I don't think that the loss of a thrust point (11/17 vs 12/18) will make enough of a difference to justify the 1.5 ton heavier engine
.
Any thoughts?
Cheetah 25 tons
Engine 225 XL - 5 tons
Thrust 11/17
HS 10 (20)
Fuel - 4 tons
Cockpit - 3 tons
Armor Ferr-Alm - 8 tons
142 points - 43/34/31
3 ERML, 2 x ML - 5 tons







Logged

